Frequently Asked Questions
Door & Window Replacement – Window Design & Installation
It will take 4-10 weeks for your windows to arrive, depending upon the product ordered.
The installation will take 1-3 days, depending on how many windows and how large the project is.
Generally, 1-3 hours for installation, depending on the different kinds of trim packages installed in your home.
We ask that all of the window treatment and coverings are taken down by the homeowner before installation.
Energy-efficient windows will reduce your utility bill. In addition, they will reduce the noise from the street. Over the last decade, the quality of the glass has allowed homeowners to see more clearly out their windows. In addition, they have been proven to keep out the harmful UV rays that damage your furniture, drapes, and carpeting, which in turn keeps the heat out in the summertime and the heat in during the winter season.
If there is an alarm system with window sensors, the homeowner is responsible for having their alarm company disconnect and reconnecting the alarms.
We try to recycle everything we can and dispose of what is necessary. However, we will be responsible for the removal and disposal of the old windows and trash in the end.
We are EPA certified, and we will conduct a test if your home was built before 1978. If the test comes back positive, then we will perform lead-safe practices during your installation.
FAQ – Need help with Valdicass Door & Window replacements or for your new window construction installation?
Call us today at 708-255-5231 for a free estimate!